Sign In | Join Free | My frbiz.com
China Beijing Zulin Formwork & Scaffolding Co., Ltd. logo
Beijing Zulin Formwork & Scaffolding Co., Ltd.
Beijing Zulin Formwork & Scaffolding Co., Ltd. ---Formwork and scaffolding solution
Verified Supplier

14 Years

Home > Climbing Formwork >

CB-240 Auto Pull-push prop / Truss type Climbing Formwork with heavy bearing load

Beijing Zulin Formwork & Scaffolding Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

CB-240 Auto Pull-push prop / Truss type Climbing Formwork with heavy bearing load

Place of Origin : Beijing, China (Mainland)

Brand Name : ZULIN

Certification : ISO9001-2008

Model Number : CB-240

MOQ : One 20ft container

Price : Negotiation

Delivery Time : After deposit 15-20 days

Payment Terms : T/T L/C (bank transfer)

Supply Ability : 100sets/day

Packaging Details : In bulk,pallet,bundle or according the customer demand

Contact Now

CB-240 Auto Pull-push prop / Truss type Climbing Formwork with heavy bearing load

Descrition:

Introduction

The climbing formwork CB-240 is mainly used in pouring concrete of piers, high buildings, and so on.

Because the concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods,

additional reinforcement is not needed. The construction is easy, rapid and economical. One single pouring

height can be adjusted in a wide range, and the surface of concrete is smooth and durable.

There are two types of climbing units for CB-240, that is, pull-push prop type and truss type. CB-240 of the

truss type is suitable for the construction work with heavy bearing load, high altitude formwork installation

and relatively small range of adjustable inclination.

CB-240 Structure Sketch

Pull-push prop type

Truss type

The Characteristics


1 The load of bracket, formwork and other load during construction are all supported by the anchor system.

There is no need to set up scaffolding. It’s suitable for high altitude construction work.
2 One single pouring height can be up to 6 meters, and the formwork unit can move backward 600mm.
3 The formwork can be adjusted horizontally or vertically as requested. The pull-push prop type formwork system

can be so adjusted as to lean forward or backward.
4 Couplings are used for the connection of the formwork units, and therefore they will stand in a straight line.

All connecting parts are on a high level of standardization and universality.
5 The formwork can stick to the concrete tightly by anchoring set to avoid dislocation and leakage.


Product Tags:

automatic climbing formwork

      

foundation formwork

      
China CB-240 Auto Pull-push prop / Truss type Climbing Formwork with heavy bearing load wholesale

CB-240 Auto Pull-push prop / Truss type Climbing Formwork with heavy bearing load Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Zulin Formwork & Scaffolding Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)